ValueLens: Value Engineering Foundations
Improve value without losing required function: the eight-phase Value Methodology, function analysis with verb–noun statements, FAST logic, cost and worth, creativity, weighted evaluation, introductory life-cycle cost, proposals and implementation.
Leads to the PVology Certified ValueLens Associate (PCVA) after you pass the exam, your practical work is approved and the Academy approves the result.
A PVology credential: not issued, accredited or endorsed by PMI, ISO, SAVE International or any other body.
Who it is for
Engineers, designers, cost and procurement specialists, project and operations staff who take part in or prepare value studies.
Prerequisite: A verified PVology account. No prior certification is required.
Learning effort: about 25 hours, calculated from the authored lessons, activities and checks.
Case study: Riverside Water pump station renewal. Riverside Water is a fictional municipal water utility. All people, figures and datasets are invented for teaching.
Syllabus
Module 1. Value methodology, ethics, required performance, and value versus cost cutting
- 1. What value means and why it is not cost cutting · about 40 minFree preview
- 2. The eight-phase Job Plan and the three study stages · about 40 min
- 3. Ethics and the PVology Value Lens · about 40 min
Learning outcomes
- Explain value as the relationship between the functions a subject performs and the resources it consumes
- Compare a cost-cutting change with a value-improving change using function, performance and cost evidence
- Classify a proposed change as value improvement, cost cutting or loss of required function
- Sequence the eight Job Plan phases and state the main output of each
- Classify study activities into pre-workshop, workshop and post-workshop stages
- Calculate the effort of a value study and compare it with the cost of the subject
- Apply the PVology Value Lens (Need, Function, Outcome, Alternatives, Value) to frame a value study subject
- Identify ethical risks in a value study, including hidden loss of function and overstated savings
- Draft a Value Lens statement for the Riverside Water pump station
Module 2. Study preparation, objectives, multidisciplinary roles and information quality
- 1. Selecting the study subject and timing · about 40 min
- 2. Objectives, sponsor, facilitator and the multidisciplinary team · about 40 min
- 3. Data requests, information quality and confidence · about 40 min
Learning outcomes
- Explain why the timing of a value study changes how much it can influence
- Calculate the addressable cost of candidate subjects from their estimate and committed share
- Compare candidate subjects and justify which should receive a value study first
- Draft study objectives that combine function, performance and resource aims
- Describe the responsibilities of the sponsor, facilitator, team members and project manager
- Justify the composition of a multidisciplinary team against the subject's main cost and performance drivers
- Draft a data request list proportionate to the study subject
- Classify information by source and confidence level
- Calculate a simple confidence profile of a cost estimate and identify where better data would most reduce uncertainty
Module 3. Stakeholder needs, constraints, performance and information-phase analysis
- 1. Stakeholder needs and the constraints register · about 40 min
- 2. Performance attributes: defining what good looks like · about 40 min
- 3. Information-phase analysis: cost drivers, Pareto and assumptions · about 40 min
Learning outcomes
- Identify stakeholders of a value study subject and express their needs in their own terms
- Classify stated requirements as mandatory constraints, preferences or assumptions to test
- Calculate the cost carried by preferences and untested assumptions in a design
- Define performance attributes with a description, a measure and a required or target level
- Distinguish mandatory performance thresholds from attributes that can be traded
- Calculate a quantified performance measure for a baseline design and compare it with an alternative
- Construct a Pareto ranking of cost elements with cumulative percentages
- Identify the cost and performance drivers that deserve the team's attention
- Draft an assumptions log entry that states effect, test, owner and date
Module 4. Function statements: active verb and measurable noun, basic and secondary functions
- 1. Writing function statements: active verb and measurable noun · about 40 min
- 2. Basic, secondary and other function classes · about 40 min
- 3. Building the Riverside Water function list · about 40 min
Learning outcomes
- Write function statements as an active verb and a measurable noun
- Identify common errors in function wording and correct them
- Explain why naming functions independently of the current solution opens new alternatives
- Classify functions as basic, secondary, required secondary or unwanted secondary
- Identify the higher-order and lower-order functions that bound a subject
- Calculate the share of a subject's cost associated with each function class and interpret it with care
- Draft a classified function list for a facility, linking each function to the elements that perform it
- Justify the choice of basic, higher-order and lower-order functions for the Riverside Water pump station
- Calculate the share of the estimate in elements that directly perform the basic function and interpret it
Module 5. Introduction to FAST logic, function relationships and scope boundaries
- 1. How and Why logic, the critical path of functions and scope lines · about 40 min
- 2. Building the first FAST model for the Riverside Water pump station · about 42 min
- 3. Applying FAST to a service and reviewing common mistakes · about 40 min
Learning outcomes
- Explain how How and Why questions link functions into a logical chain
- Classify functions as higher-order, basic, critical-path, supporting or input in a simple FAST model
- Draft a text outline of a FAST critical path with left and right scope lines
- Check a function chain by reading it in both directions
- Construct a FAST critical path for a pump station from a verb–noun function list
- Justify the placement of the basic, higher-order and input functions with How–Why reasoning
- Classify supporting functions as when-triggered or all-the-time and place them correctly
- Compare two candidate scope lines and explain how each changes the study
- Construct a FAST outline for a service process, not only for a physical asset
- Identify and correct five common FAST mistakes in a draft model
- Justify scope line positions against a stated study objective
Module 6. Function cost, worth, cost models and improvement opportunities
- 1. Allocating cost to functions and estimating worth · about 40 min
- 2. A cost and worth model for the Riverside Water pump station · about 45 min
- 3. Applying cost and worth to a service and choosing priority functions · about 40 min
Learning outcomes
- Allocate element costs to functions using a simple element-by-function matrix
- Explain worth as the lowest cost to reliably perform a function at its required performance
- Calculate a value index as worth divided by cost and interpret the result
- Compare the value index convention used in this course with the cost/worth ratio used by some practitioners
- Calculate function costs for the Riverside Water station from an element-by-function matrix
- Calculate value indexes and gaps for each function and for the station as a whole
- Rank functions by improvement opportunity and justify the priority list
- Explain why required functions are kept at full worth
- Calculate function costs, value indexes and gaps for a service using annual operating cost
- Rank functions using both value index and absolute gap and justify the ranking
- Identify where a worth estimate would wrongly remove a required function or exclude a user group
Module 7. Creativity, idea generation, facilitation and avoiding premature judgment
- 1. Separating idea generation from judgment · about 40 min
- 2. Running the Riverside Water creativity session · about 42 min
- 3. Brainwriting, facilitation choices and guarding against groupthink · about 40 min
Learning outcomes
- Explain why idea generation and judgment are kept in separate phases
- Apply the core rules of brainstorming to a function-based prompt
- Draft 'How might we' prompts from priority functions that carry required performance forward
- Identify and redirect premature judgment during a session
- Plan a creativity session for several priority functions with time and idea targets
- Apply attribute listing to generate ideas for a physical function
- Calculate idea counts and duplicate rates and interpret what they say about the session
- Calculate the idea capacity of a brainwriting round and compare it with actual output
- Select a creativity technique for a given team situation and justify the choice
- Apply a three-signal check to detect groupthink during a creativity session
Module 8. Evaluation criteria, weighted comparison and risk screening
- 1. Deriving criteria from performance attributes and weighting them · about 40 min
- 2. Screening and weighted evaluation for the Riverside Water enclosure · about 45 min
- 3. Why a weighted matrix is only as good as its criteria and weights · about 40 min
Learning outcomes
- Derive evaluation criteria from agreed performance attributes and separate them from mandatory requirements
- Calculate criterion weights from a pairwise comparison, including a base point to avoid zero weights
- Draft anchored 1–5 scoring scales for criteria
- Check a pairwise comparison for consistency
- Apply mandatory screening to an idea list and record reasons for every decision
- Calculate weights and weighted totals for alternatives in a professional example
- Compare performance scores with cost to identify alternatives worth developing
- Classify key risks of alternatives as part of evaluation screening
- Demonstrate how treating a mandatory requirement as a weighted criterion can select a non-compliant option
- Calculate how a change in weights changes the ranking of alternatives
- Identify overlapping criteria and false precision in a weighted matrix
- Justify an evaluation recommendation that states its sensitivity to weights
Module 9. Alternative development, feasibility and introductory life-cycle costing
- 1. From shortlisted idea to developed alternative: testing feasibility · about 40 min
- 2. Introductory life-cycle costing: comparing alternatives over time · about 42 min
- 3. A first look at discounting and completing the value alternative · about 42 min
Learning outcomes
- Explain the difference between an evaluated idea and a developed value alternative
- Classify feasibility concerns as technical, cost, schedule or risk
- Draft a feasibility summary for a value alternative that states assumptions and open questions
- Justify whether an alternative is ready to present, needs more work or should be dropped
- Identify the main life-cycle cost elements: initial, operating, maintenance, replacement and end-of-life
- Calculate an undiscounted life-cycle cost for two alternatives over a stated study period
- Calculate a simple payback period and explain its limitations
- Compare an initial-cost saving with the life-cycle result and explain any difference
- Calculate a present value factor using 1 ÷ (1 + r)^n and apply it to a future cost
- Calculate the present value difference between two alternatives using yearly and single-year factors
- Compare discounted and undiscounted results and explain why they differ
- Draft the cost section of a value alternative with both views and stated assumptions
Module 10. Presentation, recommendation approval and implementation ownership
- 1. Presenting value recommendations to decision makers · about 40 min
- 2. Decisions: accepting, rejecting or modifying proposals · about 40 min
- 3. Implementation planning and ownership · about 42 min
Learning outcomes
- Identify the decision makers and other audiences for a value study presentation and what each needs
- Structure a presentation that leads with decisions needed rather than with the study process
- Present recommended value without mixing initial-cost and life-cycle figures or overstating certainty
- Draft an executive summary for a set of value proposals
- Distinguish accept, accept with conditions (modify), defer and reject decisions and when each is appropriate
- Calculate the approved value of a set of decisions and the revised estimate
- Record a decision with its reason, approved value, conditions, owner and follow-up date
- Justify the rejection of a proposal that would weaken a required function
- Draft an implementation plan for an approved value proposal with actions, owners, dates and dependencies
- Sequence conditional actions so that savings are not committed before conditions are met
- Explain how approved proposals enter project change control
- Assign implementation ownership and follow-up responsibilities for each approved proposal
Module 11. Benefits verification, quality, sustainability and preventing loss of required function
- 1. Benefits verification: measures, baselines and the realization ledger · about 40 min
- 2. Verifying an operating saving: normalizing data and comparing with forecast · about 42 min
- 3. Quality, sustainability and preserving required function after implementation · about 42 min
Learning outcomes
- Distinguish identified, recommended, approved, forecast, realized and verified value
- Define a measure, baseline, data source and timing for an approved value proposal
- Explain what evidence is needed before value is recorded as realized and who should verify it
- Draft realization ledger entries for a set of approved proposals
- Calculate a normalized operating saving using a performance indicator such as energy per unit of output
- Compare realized value with a forecast adjusted for actual conditions
- Explain why a raw before-and-after comparison can mislead
- Draft a realized ledger entry with amount, period, outcome and evidence
- Apply a required-function preservation check to an implemented value proposal
- Classify evidence that safety, reliability, regulatory and performance requirements have been preserved
- Distinguish a measured sustainability benefit from an estimated one
- Draft a post-implementation review that covers cost, function, quality and sustainability
Module 12. PVology value-study lab and integrated value proposal
- 1. Guided lab: running the Riverside study in PVology Value · about 45 min
- 2. The capstone: brief, rubric and a fully worked model · about 50 min
- 3. Capstone self-review, common mistakes and submission · about 40 min
Learning outcomes
- Set up a formal value study with charter, team, discount rate and study period in PVology Value
- Record functions with cost and worth and read the resulting FAST diagram and worth-to-cost figures
- Calculate a weighted evaluation score by hand and confirm it against the tool, including a mandatory-criterion flag
- Enter life-cycle cost items, record a decision and make forecast and realized ledger entries with evidence
- Describe the required parts of the ValueLens capstone and how each is assessed
- Apply the five-criterion rubric to judge the quality of a value proposal
- Trace a complete model capstone from function analysis to implementation proposal and check its calculations
- Select a suitable capstone subject with clear required functions and available cost data
- Apply the rubric to score a draft capstone and identify the changes that would raise it
- Identify and correct common capstone mistakes in functions, numbers and recommendations
- Check every calculation in a capstone by an independent method
- Prepare a capstone for submission with a clear decision summary and stated assumptions
Capstone: Optimize a practical product, service or facility element while preserving required functions: function analysis, a simple FAST model, a cost and worth view, evaluated alternatives, a life-cycle comparison and an implementation proposal.
Certification exam
60 questions in 90 minutes; provisional pass mark 70%. Questions are scenario-based drawn from a private, reviewed bank. Results stay provisional until academy review. These are PVology assessment policies.
| Domain | Share of questions |
|---|---|
| Preparation and information | 20% |
| Functions, FAST and cost/worth | 30% |
| Creativity and evaluation | 25% |
| Development and life-cycle cost | 15% |
| Presentation and implementation | 10% |
Across the domains, about 65% of questions test professional knowledge, 20% applied tools and 15% PVology concepts.